Department Of Energy

Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

May 31, 2012 - 77 FR 32184 - RIN: - Download Full Notice: Text | PDF

The Federal Energy Regulatory Commission affirms its basic determinations in Order No. 1000, amending the transmission planning and cost allocation requirements established in Order No. 890 to ensure that Commission-jurisdictional services are provided at just and reasonable rates and on a basis that is just and reasonable and not unduly discriminatory or preferential. This order affirms the Order No. 1000 transmission planning reforms that: Require that each public utility transmission provider participate in a regional transmission planning process that produces a regional transmission plan; provide that local and regional transmission planning processes must provide an opportunity to identify and evaluate transmission needs driven by public policy requirements established by state or federal laws or regulations; improve coordination between neighboring transmission planning regions for new interregional transmission facilities; and remove from Commission-approved tariffs and agreements a federal right of first refusal. This order also affirms the Order No. 1000 requirements that each public utility transmission provider must participate in a regional transmission planning process that has: A regional cost allocation method for the cost of new transmission facilities selected in a regional transmission plan for purposes of cost allocation and an interregional cost allocation method for the cost of new transmission facilities that are located in two neighboring transmission planning regions and are jointly evaluated by the two regions in the interregional transmission coordination process required by this Final Rule. Additionally, this order affirms the Order No. 1000 requirement that each cost allocation method must satisfy six cost allocation principles.

Agency Contact: John Cohen, Federal Energy Regulatory Commission, Office of the General Counsel, 888 First Street NE., Washington, DC 20426, (202) 502-8705. Shiv Mani, Federal Energy Regulatory Commission, Office of Energy Policy and Innovation, 888 First Street NE., Washington, DC 20426, (202) 502-8240.

This rule is final. Its effective date is July 2, 2012.


Image 01 Image 02 Image 04 Image 05 Image 08