June 4, 2012 - 77 FR 32889 - RIN: 2120-AA64 - Download Full Notice: Text | PDF
We are adopting a new airworthiness directive (AD) for all The Boeing Company Model 777 airplanes. This AD was prompted by four reports of retaining cross bolt hardware not fully engaged into the fuse pins of the forward trunnion lower housing of the main landing gear (MLG), which could result in an incorrect MLG emergency landing break-away sequence. This AD requires a detailed inspection of the fuse pin cross bolts and fuse pins of the left and right MLG forward trunnion lower housing to verify that the cross bolts are correctly installed and that there are no missing fuse pins, and replacement of the fuse pins if necessary. We are issuing this AD to prevent an incorrect emergency landing MLG break-away sequence, which could result in puncturing of the wing box and consequent fuel leaks and an airplane fire. Failure of the fuse pins could also result in a possible landing gear collapse causing a runway excursion during take-off or landing.
Agency Contact: James Sutherland, Aerospace Engineer, Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office (ACO), 1601 Lind Avenue SW., Renton, Washington 98057-3356; phone: 425- 917-6533; fax: 425-917-6590; email: James.Sutherland@faa.gov.
This rule is final. Its effective date is July 9, 2012.
Submit links with information related to this regulation and your link will appear right here on this page. Agency docs, academic and industry reports, news articles are all appropriate.
We want to make OpenRegs.com as useful tool for everyone interested in regulation. Please help us improve by sending us your comments and suggestions.