Department Of Transportation

Airworthiness Directives; The Boeing Company Airplanes

June 4, 2012 - 77 FR 32889 - RIN: 2120-AA64 - Download Full Notice: Text | PDF

We are adopting a new airworthiness directive (AD) for all The Boeing Company Model 777 airplanes. This AD was prompted by four reports of retaining cross bolt hardware not fully engaged into the fuse pins of the forward trunnion lower housing of the main landing gear (MLG), which could result in an incorrect MLG emergency landing break-away sequence. This AD requires a detailed inspection of the fuse pin cross bolts and fuse pins of the left and right MLG forward trunnion lower housing to verify that the cross bolts are correctly installed and that there are no missing fuse pins, and replacement of the fuse pins if necessary. We are issuing this AD to prevent an incorrect emergency landing MLG break-away sequence, which could result in puncturing of the wing box and consequent fuel leaks and an airplane fire. Failure of the fuse pins could also result in a possible landing gear collapse causing a runway excursion during take-off or landing.

Agency Contact: James Sutherland, Aerospace Engineer, Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office (ACO), 1601 Lind Avenue SW., Renton, Washington 98057-3356; phone: 425- 917-6533; fax: 425-917-6590; email: James.Sutherland@faa.gov.

This rule is final. Its effective date is July 9, 2012.


Image 01 Image 02 Image 04 Image 05 Image 08