Environmental Protection Agency

Approval and Promulgation of Air Quality Implementation Plans: Georgia; Control Techniques Guidelines and Reasonably Available Control Technology

July 31, 2012 - 77 FR 45307 - RIN: - Download Full Notice: Text | PDF

EPA is proposing to approve three final and one draft State Implementation Plan (SIP) revisions submitted by the State of Georgia, through the Georgia Environmental Protection Division (GA EPD), to EPA on November 13, 1992, October 21, 2009, March 19, 2012, and July 19, 2012 (draft SIP revision). With regard only to the July 19, 2012, SIP submission, EPA is also proposing, in the alternative, to conditionally approve that revision which relates to certain control techniques guidelines (CTG) categories. Together, these four revisions establish reasonably available control technology (RACT) requirements for the major sources located in the Atlanta, Georgia 1997 8-hour ozone nonattainment area (hereafter referred to as the ``Atlanta Area'') that either emit volatile organic compounds (VOC), nitrogen oxides (NOx), or both. Georgia's SIP revisions include certain VOC source categories for which EPA has issued CTG. EPA has evaluated the proposed revisions to Georgia's SIP, and has made the preliminary determination that they are consistent with statutory and regulatory requirements and EPA guidance.

Agency Contact: Jane Spann, Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia 30303-8960. Ms. Spann may be reached by phone at (404) 562-9029, or via electronic mail at spann.jane@epa.gov.

This is a proposed regulation. Comments were due on August 30, 2012.


Image 01 Image 02 Image 04 Image 05 Image 08