Department Of Homeland Security
August 8, 2012 - 77 FR 47331 - RIN: 1625-AA11 - Download Full Notice: Text | PDF
The Coast Guard is proposing changes to the existing regulated navigation area in the navigable waters of New Haven Harbor, Quinnipiac River and Mill River. The current RNA pertains only to the operation of tugs and barges. The changes would allow periodic, temporary closure of the area which will be needed during construction of the new Pearl Harbor Memorial Bridge, and which could be needed at other times as well. This proposed revision would allow the Coast Guard to suspend all vessel traffic through the RNA during periods of temporary closure. This rule is necessary to provide for the safety of life in the regulated area.
Agency Contact: If you have questions on this proposed rule, call or email Petty Officer Joseph Graun, Prevention Department, U. S. Coast Guard Sector Long Island Sound, (203) 468-4544, Joseph.L.Graun@uscg.mil; or Lieutenant Isaac M. Slavitt, Waterways Management Division, U.S. Coast Guard First District, (617) 223-8385. If you have questions on viewing or submitting material to the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826.
This is a proposed regulation. Comments were due on September 7, 2012.
Submit links with information related to this regulation and your link will appear right here on this page. Agency docs, academic and industry reports, news articles are all appropriate.
We want to make OpenRegs.com as useful tool for everyone interested in regulation. Please help us improve by sending us your comments and suggestions.